Map
Scenes
Poles
Returns
3D
Coverage
Audit
Elba, Alabama
Where the LiDAR flew
The 56 delivered 3DEP tiles, and every road split at the edge of them. This is an aircraft survey, not a drone: inside the footprint the ground is covered wall to wall, so the only question is where the footprint ends.
…
coverage by how far out you care
within
road km
covered
%
layers
tile footprint, shaded by density
road inside the survey
road outside it
1, 2, 5 and 10 km from the centre
the 163 detected poles